New upgrades over summer break begin campus beautification
The pool reconstruction, the new HVAC system, the new Bowl benches and the facelift to the administration building are some of the changes that occurred on the FVHS campus this summer.
The pool reconstruction, the new HVAC system, the new Bowl benches and the facelift to the administration building are some of the changes that occurred on the FVHS campus this summer.
The current pool is an ongoing frustration to the athletes, as many try to find ways to adjust to the disadvantages.
Due to the Slater bridge closure, students have the option to ride a Karmel shuttle to school.